External Results

The External Results page is the way in for results produced by another laboratory — a

subcontractor you sent a sample to (ISO/IEC 17025 §6.6, §7.8.2). The inbox shows the shipments that

have been sent and are awaiting results.

Menu path: Daily Work → External Results.

Two ways to bring in results

  • Manual entry: fill in values row by row for each measurement, together with unit, uncertainty,

SOP reference, and optionally cost.

  • CSV upload: upload the external lab's file, in three steps:
StepWhat it asks
FileChoose the CSV. Its headers are read.
MappingWhich column is the sample code, which the element code, and which the value (required); optionally unit, uncertainty and SOP reference.
PreviewHow many rows will be filled, how many skipped and how many ignored, before you commit.

On confirm, the column mapping is saved for the supplier: the next file from the same

subcontractor opens with the columns already chosen. The mapping is supplier configuration, so only a

user with the «Edit Instruments» permission (e.g. the Lab Director) saves it; the first CSV import

from a new supplier is done by them.

Connects to

  • Shipments — the other end of the same flow: there you pack and send, here you receive.
  • Suppliers — the subcontractor must be an evaluated provider (§6.6).
  • Measurements — the values land on the analysis record's measurements.
  • Analysis report — a result from an external lab must be declared as such on the report

(§7.8.2).

If this is missing

  • 🔴 If a result never arrives, the analysis stays open silently. The sample reads as "in progress"

with nothing showing that it is waiting on a third party — which is why days outstanding count.

  • A wrong column mapping is the real danger: a value landing on the wrong element passes every

sanity check, because it is a valid number in a valid field. The preview exists precisely for

this — read it.

  • Without uploading the subcontractor's own report, the evidence is your data entry rather than

their document. An assessor wants the second.

Notes

  • In the inbox, the number of days outstanding is highlighted once it passes 14 days since the shipment was sent.
  • Measurements that have already been brought in are shown as "Already ingested" and are not overwritten during a CSV upload.
  • When all the measurements in a shipment have results, the shipment moves to the Completed status.
  • See also: Shipments, Suppliers.