The Management Reviews page documents periodic quality system reviews by management, per EN ISO/IEC 17025:2017 §8.9.
Found under: ISO 17025 → Quality System → Reviews.
| Button | Action |
|---|---|
| Add — Create a new record | |
| Columns — Show/hide table columns | |
| Filters — Open/close the filter panel. A red dot indicates active filters | |
| Export CSV — Download table data as a CSV file | |
| Orientation — Toggle between portrait and landscape printing | |
| Print — Generate a PDF of the current view | |
| Help — Open the help dialog | |
| Search — Quick search through table data |
Clicking the icon on each row shows:
| Field | Description |
|---|---|
| Code | Unique review code. Leave blank for auto-numbering. |
| Date | Date the review was conducted |
| Conducted By | The person who led the review |
| Status | Scheduled, In Progress, Completed or Approved — colour-coded |
| Next Review | Date of next review — shown in red if overdue |
| Period From | Reporting period start date (hidden column) |
| Period To | Reporting period end date (hidden column) |
| Attendees | Members who attended the review (hidden column) |
| Prev. Action Status | Status of actions from the previous review (hidden column) |
| Key Findings | Main findings and conclusions (hidden column) |
| Decisions | Decisions made (hidden column) |
| Action Items | Actions decided (hidden column) |
| Notes | Additional remarks (hidden column) |
The core details (code, dates, participants, status) stay at the top. Below them the dialog has tabs:
| Tab | What it holds | When it shows |
|---|---|---|
| Inputs | The input items §8.9.2 enumerates | always |
| Review Actions | The actions decided here | existing review only |
| Carried-over Actions | Open actions from the previous review | only when there are any |
A red dot on a tab means it hides a missing required field. The dialog always opens on Inputs.
Approve on a review's row (via the row-action menu, not Delete) opens a dialog that requires a mandatory reason. A review already in Approved status cannot be approved again. Approving is restricted to the Lab Director, Quality Manager or Reviewer (§8.9).
If the immediately preceding review still has open output actions that were not carried over into this one, approval is blocked (§8.9.2, point d — status of actions from previous management reviews). The Lab Director or Reviewer can override this check by recording a written override reason.