Preparing for an accreditation assessment
An assessment visit is mostly retrieval. The assessor picks a report, a sample, an instrument or a person, and follows the trail: who did the work, with what, under which conditions, and what happened when something went wrong. A lab that can produce that trail in minutes spends the visit on substance; a lab that searches binders spends it explaining gaps.
This page describes what assessors usually ask for and how to pull it out of Agrometrisis.
The vertical audit: one report, end to end
The most common request is a vertical audit: take one issued report and show every record behind it. Open Analyses, pick the record from its row menu and choose Vertical Audit Pack (ISO 17025). The PDF follows the report back through:
- §7.1 review of the request and contract;
- §7.4 the sample's chain of custody, from receipt;
- §7.5, §7.6 and §6.5 the results, their uncertainty and the traceability of the equipment used;
- §6.3 environmental conditions;
- §7.7.1 internal quality control for the run;
- §6.2 the competence of the people involved at the time of the work;
- §7.8 the report, its review and approval;
- §7.11.3 the audit trail.
Three more packs answer the other questions assessors tend to follow up with. Each is a PDF opened from the row menu of its page:
- Equipment Audit Pack (ISO 17025) on Instruments: the calibration programme, calibration history and traceability, intermediate checks, maintenance, verification before use, service state and the analyses affected, and the audit trail.
- Personnel Audit Pack (ISO 17025) on Users: authorisations and competence (current and past), competence monitoring, training, impartiality and confidentiality declarations, acknowledgements of controlled documents, and the audit trail. Only the Lab Director can produce it.
- Nonconformity Audit Pack (ISO 17025) on Deviations, and Complaint Audit Pack (ISO 17025) on Customer Complaints: the nonconforming work or complaint, the corrective action and its effectiveness check, and the audit trail. A source closed without a corrective action is flagged.
Gaps are shown, not hidden
Every pack opens with its findings: a short list of what is missing or questionable in that particular record (a calibration that was not in force, a competence that had lapsed, an empty section), followed by a table of the sections that had no data. The point is to find these before the assessor does, while there is still time to deal with them.
The Accreditation Dry-Run Dossier
Accreditation Dry-Run Dossier (in the ISO 17025 menu, under the quality system) produces one PDF in two parts, with Generate PDF:
- Part A walks through the clauses of the standard from §4 to §8, with a data-integrity (ALCOA+) appendix and an index of reference documents. Be clear about what this part is: it describes how the software covers each clause. It is the same for every lab and does not examine your records.
- Part B is about your lab, built from your own data: your accreditation details, your records-lifecycle posture, coverage of the audit programme, customer satisfaction, and quality-system indicators such as open deviations without a corrective action, overdue effectiveness checks, overdue management-review actions and audit findings without a corrective action. Those counts are the part worth reading closely before a visit.
The quality system itself
The assessor will also look at how the management system runs between visits:
- Audit Programme holds the annual plan of internal audits and what each must cover (§8.8); Audits records each audit and its findings.
- Reviews records management reviews and their actions (§8.9).
- On Document Control, staff confirm each approved document with Read and understood; those acknowledgements appear in the personnel pack.
- Audit Trail, Record Access Log and Login Log answer the data-integrity questions of §7.11 (see What ISO/IEC 17025 asks of lab software).
A practical order of work
- A few weeks before the visit, print the Dry-Run Dossier with Part B and clear what its counts show.
- Pick three or four recent reports, across different analysis types, and run the vertical pack on each. Fix what the findings list shows, through amendments with a reason where a record has to change.
- Run the equipment pack on the instruments those reports used, and the personnel pack on the people who signed them.
- Check the audit programme against what was actually audited, and that the last management review's actions are closed.
None of this replaces the lab's own judgement, and accreditation is granted to the laboratory, not to its software. What the packs change is the time it takes to show the evidence.
You can open each pack on sample data in the live demo, with no sign-up, or on your own records with the 30-day free trial.